| Name
of Project & Main Characterists |
Client |
Location
& Completion Year |
Value
of Contract
(Rs.) |
Scope
of Service |
| |
|
|
|
|
| Construction
and Rehabilitation of Bridges, 72/3, 73/1 and 81/1 and 87/1
of Colombo - Galle Road |
Road
Development Authority |
Between
Balapitiya & Ambalangoda 2000 |
103
M |
Complete
construction of bridges 72/3, 81/1 and 87/1 and widening of
bridge no. 73/1. Construction of approaching roads. |
| Construction
of Factory Complex |
Orient
Garments |
Mattegoda
2000 |
74
M |
Construction
of 02 storeyed factory building, office and facility building
and other infrastructure facilities. |
| Extension
to factory complex |
Orient
Garments |
Weligama
2000 |
8
M |
Construction
of a facility block and ware house |
| Factory
extension to Ceylon Biscuits Ltd. |
Ceylon
Biscuits Ltd |
Makumbura
1999 |
10
M |
Extension
to existing building |
| Construction
of Factory buildings for Stafford Orient Garments Ltd at Deniyaya |
Stafford
orient Garments Ltd |
Deniyaya
1998 |
56
M |
Factory
building, facility building and all infrastructure facilities |
| Construction
of standard factory for the Koggala EPZ |
Board
of Investment |
Koggala
1998 |
20
M |
Construction
of a factory building inclusive of all infrastructure facilities. |
| Construction
of a Ware House at Airforce Base Katunayake |
Sri
Lanka Airforce |
Katunayake
1997 |
2.25
M |
Construction
of prefabricated Ware House |
| Dyeing
Mill building floor area 676 m2 |
Hoshin
Lanka (Pvt) Ltd |
EPZ
Biyagama |
3
M |
Erection
of precast concrete structures and all other finishes |
| Butler
Steel |
Elastomeric
Castors & Wheels (Pvt) Ltd |
Piliyandala
1993 |
2.5
M |
Erection
of column beams and roof work complete with roofing insulation
and ceiling gutters and down pipes with wall cladding |
| Lanka
Tiles Factory |
Elastomeric
Castors & Wheels (Pvt) Ltd |
Jaltara,
Ranala 1993 |
30
M |
Construction
of factory building extension and basement store and machine
foundation |
| Sub
Structure |
South
Textiles Lanka (Pvt) Ltd |
Pannala
1993 |
60
M |
Construction
of structure, concrete AC ducts and AC plant basements. |
| Butler
Steel |
South
Textiles Lanka (Pvt) Ltd |
Pannala
1993 |
20
M |
Erection
of columns, beams and roof work complete with roofing insulation
and ceiling, gutters and downpipes |
|
Factory
Building floor area 525 m2
|
Jin
Jin Lanka (Pvt) Ltd |
EPZ
Biyagama 1993 |
2.6
M |
Construction
of factory building at EPZ Biyagama |
| Factory
building floor area 3072 m2 |
Giorgio
Morandi (Pvt) Ltd. |
Hanguranketa
1993 |
22
M |
Construction
of Factory, office link, facility building infrastructural work
and electrical installation |
| Factory
building floor area 1716 m2 |
Ceyko
Projects (Pvt) Ltd |
Veyangoda
1993 |
2.7
M |
Erection
of precast concrete structure with roof cladding |
| Warehouse
Floor area 1560 m2 |
C
& H Lanka (Pvt) Ltd |
Biyagama
1993 |
10.35
M |
Construction
of warehouse building, infrastructure work and electrical installation |
| Pradeshiya
Sabha Garment Factory floor area 2740 m2 |
Maliban
Textiles |
Deraniyagala
1993 |
15.2
M |
Construction
of factory, office and facility building infrastructural work
and electrical installation |
| Pradeshiya
Sabha Garment Factory - Floor area 2740 m2 |
Favourite
Hanwella |
Hanwella
1993 |
15.2
M |
Construction
of factory, office and facility building, infrastructure work
and electrical installation |
| Factory
Building floor area 1466 m2 |
K
& S Lanka (Pvt) Ltd |
Biyagama
1992 |
10.25
M |
Construction
of factory, warehouse & administration building at EPZ Biyagama |
| Pradeshiya
Sabha Garment Factory floor area 2815 m2 |
Orient
Garments Ltd |
Weligama
1992 |
11.9
M |
Construction
of factory inclusive of facilities building |
| Pradeshiya
Sabha Garment Factory |
Hidramani
Industries |
Kuruwita
1992 |
11.25
M |
Construction
of Factory inclusive of facilities building |
| Factory
Building Floor area 5526 m2 |
Hoshin
Lanka (Pvt) Ltd |
Biyagama
1992 |
43.5
M |
Construction
of factory, facilities and office building at EPZ Biyagama |
| Factory
building floor area 900 m2 |
Joy
lanka (Pvt) Ltd |
Biyagama
1992 |
6.5
M |
Construction
of factory, facilities and office building at EPZ Biyagama |
| Factory
building floor area 1050 m2 |
B
& C Lanka (Pvt) Ltd |
Biyagama
1992 |
7
M |
Construction
of factory, facilities and office building at EPZ Biyagama |
| Factory
building floor area 1050 m2 |
B
& C Lanka (Pvt) Ltd |
Biyagama
1992 |
7
M |
Construction
of factory, facilities and office building at EPZ Biyagama |
| Factory
Building Floor area 2444 m2 |
Panorama
Ceylon (Pvt) Ltd |
Biyagama
1992 |
14
M |
Construction
of factory building inclusive of facilities at EPZ Biyagama |
| Factory
Building floor area 1170 m2 |
Jin
Jin Lanka (Pvt) Ltd |
Biyagama
1992 |
9.3
M |
Construction
of factory building inclusive of facilities at EPZ Biyagama |
| Factory
and facility building floor area 3208 m2 |
C
& H Lanka (Pvt) Ltd |
Biyagama
1992 |
18.7
M |
Construction
of factory building no. 7 inclusive of facilities at EPZ Biyagama |
| Factory
building. Total floor space 6130 m2 |
C
& H Lanka (Pvt) Ltd |
Biyagama
1991 |
36.6
M |
Construction
of factory buildings at EPZ Biyagama, Phse II - Stage II |
| Main
building works, Administration Block, condom tester budg. Surgical
Gloves and packing |
Ansell
Lanka (Pvt) Ltd |
Biyagama
1989 |
14
M |
Main
building works including water supply and drainage - Taltal
floor space 2600 m2 |
| Factory
complex. Total floor space 3172 m2 |
C
& A Toy Co. Ltd |
Biyagama
1989 |
11
M |
Construction
of factory and facilities building with steel roof trusses |
| Facory
and office compelx. Total floor space 42000 m2 |
Bradbury
Wilkinson Pte Ltd. |
Biyagama
1987 |
22
M |
Complex
Civil works together with electrical installation and other
services |
| Factory
complex and ancillary buildings. Total floor space 20000 m2 |
Nestle
(Lanka) Ltd. |
Pannala
1983 |
49
M |
Factory
complex including prefabricated buildings, tower for milk processing,
waste water treatment plant, river intake, storm water drainage
line, road work etc. |
| |
|
| |
|
| |
Highrise
Commercial Buildings |
| |
|
|
| Name
of Project & Main Characterists |
Client |
Location
& Completion Year |
Value
of Contract
(Rs.) |
Scope
of Service |
| |
|
|
|
|
| Construction
of office building |
Setmil
Developers Ltd |
Colombo
13 2000 |
45
M |
Construction
of a five storeyed office complex and a 3 storeyed car park |
| Construction
of Access Towers at Union Place |
Vinitha
Realities (Pvt) Ltd |
Union
Place 1998 |
160
M |
Construction
of a 12 storeyed office compelx and a 3 storeyed car park |
| Construction
of entrance porch and loading bay at Galadari Hotel |
Galadari
Hotels |
Colombo
1998 |
11
M |
Construction
of a new entrance porch and 2 slabs for loading bay |
| Construction
of Head Office compelx for Allied Properties Ltd. |
Allied
Properties Ltd |
Nawam
Mawatha Colombo-02 1997 |
100
M |
Construction
of a 9 storeyed office complex inclusive of two underground
basements |
| Construction
of Head Office complex for Development Holdings Pvt Ltd |
Development
Holdings Ltd |
Nawam
Mawatha Colombo-02 1997 |
338
M |
Construction
of an 18 storeyed office complex inclusive of all services |
| Construction
of Tele Surveillance Centres |
Degreemont
SA/NWS & DB |
Ambatale
and Maligakanda 1995 |
28
M |
Construction
of control buildings & associated works at Ambatale and
Maligakanda for Colombo & Greater Colombo Water Supply Scheme |
| Rangalla
Naval Camp Port of Colombo |
State
Engineering Corporation |
Colombo
Port 1992 |
50.7
M |
Construction
of a seven storeyed building |
| Medical
CentreTotal floor space 63848 m2 |
Dept
of Police |
Narahenpita
1992 |
62
M |
Entire
project including electrical installation and road work |
| Police
Constables Quarters for STF |
Ministry
of Defence |
Katukurunda
1992 |
21
M |
Construction
of Building |
| Sergeants
Quarters for STF |
Ministry
of Defence |
Katukurunda
1992 |
12.3
M |
Construction
of Building |
| Officers
Quarters for STF |
Ministry
of Defence |
Katukurunda
1992 |
11
M |
Construction
of Buildings |
| Headquarters
BuildingTotal floor space 35000 m2 |
Ceylon
Tourist Board |
Colpetty
1989 |
14
M |
Four
storeyed building with all modern facilities such as lifts,
alarm systems and electrical installations |
| Sri
Lanka - German Railway Technical Training Centre |
German
Agency for Technical Corp |
Ratmalana
1986 |
22.8
M |
Administration
block and 4 nos. workshops with overhead water tower, sump,
internal roads, boundary wall, sewerage |
| Auditorium
Block(Stage II super structure) Total floor space 15000 m2 |
Dept
of Buildings |
Beliatta
1987 |
5
M |
Construction
of three storeyed building |
| Office
ComplexTotal floor space 60000 ft2 |
Carson
Cumber Batch & Co. Ltd |
Colombo
1985 |
51.5
M |
Ten
storeyed building with central air conditioning, lifts and all
modern facilities |
| Supermarket
Complex |
Colombo
Municipal Council |
Borella
1982 |
21.1
M |
Work
includes all services including electrical and mechanical installation |
| Supermarket
complex.Total floor space 35000 ft2 |
State
Trading (Textile) Corp |
Colombo
1982 |
21
M |
Construction
of seven storeyed shopping and office complex. Services include
central air conditioning, protection system, electrical and
mechanical installation |
| Gantry
Crane Project |
Sri
Lanka Ports Authority |
Colombo
1982 |
8
M |
All
civil works for the installation of gantry cranes. Work includes
piling, Crane beams and installation of 2 x 1 600 KVA 1 KV/3.3
KV transformer, switch gear, cabling and 2 Gantry Cranes |
| Commercial
Complex: Total Floor space over 50000 m2 |
Ministry
of Plan Implementation |
Kurunegala
1981 |
20.2
M |
Multi-storeyed
complex comprising of shopping, Banking & Administration
areas including all infrastructures. Also constructed 40000
gallon capacity elevated water tower |
|
|
| Name
of Project & Main Characterists |
Client |
Location
& Completion Year |
Value
of Contract
(Rs.) |
Scope
of Service |
| |
|
|
|
|
| Construction
of SOS Children's Village |
SOS
Kinderdorf International |
Moneragala
2000 |
62
M |
Construction
of 12 family type houses and infrastructure works |
| Construction
of Housing Complexes |
ICC
Housing (Pvt) Ltd |
Pepiliyana
2000 |
21
M |
30
Housing Units |
| Construction
of Expatriate Camp |
Skansa
Int'l Civil Engineering AB |
Kukule
2000 |
65
M |
Construction
of family houses and Bachelor's quarters |
| Construction
of two storeyed residential building |
Pan
Asia Ltd |
Battaramulla
1999 |
10
M |
Constrcution
of a two storeyed residential building including swimming pool |
| Gam
Udawa - 1987 |
National
Water Supply and Drainage Board |
Kataragama
1987 |
32
M |
Construction
of 92 houses in housing clusters, parliament complex, foot bridge,
bus stand, restaurant and project office |
| Fifty
one unit housing scheme - total floor space 28000 ft2 |
Urban
Development Authority |
Ratmalana
1987 |
11
M |
Three
storeyed building consisting of fifty one units with sump and
overhead water tanks |
| Luxury
Housing Scheme. Total floor space 1200 ft2 |
National
Housing Development Authority |
Colombo
1981 |
17.5
M |
Fifty
units of two storeyed luxury type semi-detached houses |
| VOA
Relay Station |
VOA
& Brown & Root Int'l |
Iranawila
Chilaw 1994 |
25
M |
Supply
of concrete precasting and construction of office building |
| SOS
Children's village |
Sos
Kinderdorf |
Anuradhapura
1994 |
34
M |
Construction
of fourteen villas, community center, staff quarters & associated
infrastructure work |
| Staff
Housing for ATI |
GTZ |
Moratuwa
1994 |
12
M |
Construction
of a multi-storeyed building with concrete structure |
| |
|
| |
|
| |
Infrastructure
(Irrigation, Bridges & Highways, Water Supply & Sanitation
Projects |
| |
|
|
| Name
of Project & Main Characterists |
Client |
Location
& Completion Year |
Value
of Contract
(Rs.) |
Scope
of Service |
| |
| Construction
of Operation & Maintenance camp for Kukule Ganga Hydro Power
Project |
Ceylon
Electricity Board |
Kukule
2000 |
166
M |
Complete
construction of approx. 55 nos. of buildings & infrastructure
facilities |
| Construction
of Anti-Ram Knee Wall |
International
Boradcasting Bureau/Voice of America |
Iranawila
2000 |
17.1
M |
Construction
of Security Wall |
| Sapugaskanda
Power Station 2nd Extn. Project |
MAN
B&W/CEB |
Sapugaskanda
2000 |
290
M |
Complete
Civil Works inclusive of all infrastructure of a 40 MW Diesel
Power Plant Extension |
| Sapugaskanda
Power Station Extension Project |
MAN
B&W/CEB |
Sapugaskanda
1998 |
340.8
M |
Complete
construction of the power house inclusive of 4 nos. engine block
foundations, workshop building, tank farms etc. |
| Asphalt
laying on Piliyandala - Katubedda Road |
Road
Development Authority |
Colombo
District 1998 |
15
M |
Laying
of Asphalt Regulating Course & Wearing Course on Piliyandala
- Katubedda Road about 2 KM Section |
| Rehabilitation
of Hanwella - Kaduwela & part of Maharagama - Dehiwela Road |
Road
Development Authority |
Colombo
District 1998 |
110
M |
Complete
rehabilitation of 15.5 Km of existing roads including Asphalt
paving of total length |
| Asphalt
laying on Colombo - Galle - Hambanthota Road from Moratuwa to
Ratmalana |
Road
Development Authority |
Moratuwa
1998 |
50
M |
Laying
Asphalt Regulating & Wearing Courses on 5 Kms. |
| Colombo
Urban Transport Project - Olcott Mawatha Rehab. Contract No.
OMC5 |
Colombo
Municipal Council |
Olcott
Mawatha 1997 |
37
M |
Complete
rehabilitation of 0.7 Km roadway inclusive of storm waterdrains,paved
sidewalks etc. |
| Rehabilitation
of Peliyagoda - Kadawatha, Hendala - Hunupitiya, Kirindiwitha
- Ganemulla & Wattala - Mahara |
Road
Development Authority |
Colombo
District 1996 |
318
M |
Complete
rehabilitation of 21.5 Km of existing roads. |
| Colombo
Urban transport Project Sri Sangaraja Mawatha |
Colombo
Municipal Council |
Sri
Sangaraja Mawatha 1996 |
28.6
M |
Complete
rehabilitation of 0.6 Km of roadway inclusive of stormwater
drains, paved sidewalks etc. |
| Construction
of Culverts |
Boskafls
Int'l BV/Landa Reclamation & Dev Corporation |
Muthurajawela
1996 |
18
M |
Construction
of 2 nos. culverts on precast concrete piles |
| Rehabilitation
of Galle Road from katubedda Junction to Moratuwa |
RCDC/RDA |
Ratmalana
Moratuwa 1996 |
46.5
M |
Rehabilitation
of 3 Km of 6 lane dual carriageway |
| Ambatale
Water Treatment Facilities Extension Project |
NWS
& DB & Degremong SA |
Ambatale
1993 |
172
M |
Earthwork,
pipe laying, RC strcutres |
| Road
Works |
South
Textiles Lanka (Pvt) Ltd |
Pannala
1993 |
21
M |
Construction
of storm water drainage system, roads & landscaping |
| Infrastructure
Development Project - Phase II |
Greater
Colombo Economic Commission |
Biyagama
1989 |
90
M |
Land
Development of 25 Hz. For factory building. Water supply system
with 3000 in of ductile iron pipes, 2500m of PVC pipes &
associated manholes & pump houses. Sewer disposal system
with 4200 Km of victrified clay pipes along with valve chambers
& lift stations. Road Network of 9 Km |
| Nilwala
Ganga Floor Protection Scheme - Stage II Pump Station |
French
Aid Programme |
Matara
1988 |
14.8
M |
This
60m long pump house structure consists of sixteen, 15 m high
reinforced concrete structural frames. The project also include
8m wide & 60 m long road bridge with reinforced concrete
deck. |
| Nilwala
Ganga Flood Protection Scheme - Stage II Bandattara Bridge |
Department
of Irrigation |
Matara
1988 |
5.6
M |
Construction
of bridge across Nilwala ganga with four spans of precast beams
of 17 m lengths. |
| Gam
Udawa 1988 |
National
Water supply & Drainage Board |
Anamaduwa
1988 |
7.8
M |
Construction
of 225,000 Ltrs. Capacity water tower, aerator settling tank
& clear water sump |
| Reservoir
for the Colombo Water Supply Scheme |
National
Water supply & Drainage Board |
Kolonnawa
1987 |
9.5
M |
Construction
of 9.9 million Ltr. Capacity water reservoir & connected
pipe work, valve chambers etc. |
| Block
506 - System G Mahaweli Development Programme |
Dept
of Irrigation |
Elahera
1986 |
11.6
M |
Heavy
excavation & construction of canals, structures & bridges |
| Nilwala
Ganga Flood Protection Scheme - State I |
Dept
of Irrigation |
Matara
1985 |
12.5
M |
Construction
of pump house & ancillary work involving flood control structures |
| Bridge
No. 1 |
Dept
of Highways |
Panadura
- Ratnapura Road 1985 |
1.4
M |
Construction
of 50 ft. span bridge which consists of foundation abutments,
wing walls and approaches |
| Bridge
No. 2 |
Dept
of Highways |
Panadura
- Ratnapura Road 1985 |
1.3
M |
Constructional
50 ft. span bridge which consists of foundation abutments, wing
walls & approaches |
| Bridge
No. 3 |
Dept
of Highways |
Puttalam
- Anuradhapura Road 1985 |
2.7
M |
Constructional
50 ft. span bridge which consists of foundation abutments, wing
walls & approaches |
| Diesel
Power Generator Project - 4 nos. D/G sets totaling to 80 MW |
Ceylon
Electricity Board |
Sapugaskanda
1984 |
40
M |
Main
Power House |
| Reservoir
for Water Supply Scheme |
National
Water supply & Drainage Board |
Trincomalee
1982 |
13.4
M |
Total
number of reservoirs 4 nos. in addition there is one over head
reservoir with a capacity of 600,000 gallons of water. Work
included insitu concrete circular reservoirs. |
| |
|
| |
|
| |
Sports,
Institutional & Hotel Complexes |
| |
|
|
| Name
of Project & Main Characterists |
Client |
Location
& Completion Year |
Value
of Contract
(Rs.) |
Scope
of Service |
| |
| Construction
of Four Star tourist Resort Hotel |
Dulmini
Ent. (Pvt) Ltd. |
Aluthgama
1997 |
335
M |
Construction
of a basement, 4 storeyed superstructure, timber joinery works,
floor drilling etc., & external infrastructure facilities
inclusive of Swimming Pool |
| Upgrading
of Swimming Pool of St. Thomas' College, Mt. Lavinia |
Board
of governoers - St. Thomas' College - Mt Lavinia |
Mt
Lavinia 1999 |
19.5 M |
Demolition
of existing Swimming Pool & construction of 25 m long Swimming
Pool |
| Construction
of Peoples church at Narahenpita |
Assembly
of God Church |
Narahenpita
1999 |
61
M |
Construction
of pile caps, concrete strcutre, 3 floors brick work & finishers |
| Extension
to British Council Language Centre |
The
British Council |
Colombo
3 1998 |
15
M |
Extension
to existing building |
| Construction
of New Class room block for Infant School |
Colombo
International School |
Colombo
7 1998 |
35
M |
Construction
of 3 storeyed precast concrete building |
| Expansion
of Institute of Tech. Studies (ITS) floor area 20000 m2 |
ITS |
Nawala
1995 |
92
M |
Multi-storeyed
teaching accommodation & library blocks & multi-purpose
hall |
| New
Classroom Block for Colombo Int'l School (CIS) |
CIS |
Gregory's
Road, Colombo 7 1995 |
26.5
M |
Construction
of 5 storeyed classroom block |
| Convention
Halls, Lecture Halls & Laboratories |
North
Colombo Medical College |
Ragama
1988 |
6.7
M |
Three
storeyed building with all modern facilities & electrical
installation works |
| College
Wing for North Colombo General Hospital |
North
Colombo Medical College |
Ragama
1985 |
27.5
M |
Complete
civil works including electrical & other services |
|
|
|
|
|